Alan Boraas

He attended UAF for a year and worked the following summer with a UAF team scouting the route of the upcoming Trans-Alaska Pipeline for archaeological sites.

Bruce Bolt

He was a consultant on seismology for every major earthquake engineering project including on the Diablo Canyon Power Plant as well as international projects including the Aswan Dam and the Trans-Alaska Pipeline System.

Carnobacterium pleistocenium

These bacterial cells were discovered in a tunnel dug by the Army Corps of Engineers in the 1960s in order to allow scientists to study the permafrost in preparation for the construction of the Trans-Alaska Pipeline System.

Heat pipe

For example, in the Trans-Alaska Pipeline System residual ground heat remaining in the oil as well as heat produced by friction and turbulence in the moving oil could conduct down the pipe's support legs and melt the permafrost on which the supports are anchored.

Ralph Brazelton Peck

He continued to work until 2005 and was highly influential as a consulting engineer, with some 1,045 consulting projects in foundations, ore storage facilities, tunnel projects, dams, and dikes, including the Cannelton and Uniontown lock and dam construction failures on the Ohio River, the dams in the James Bay project, the Trans-Alaska Pipeline System, the Dead Sea dikes and the Rion-Antirion Bridge in Greece.

Raymond Alvah Hanson

He went on to found a company that became a world leader in the design and production of custom commercial machinery, including the largest canal finishing machinery in the world for the California aqueduct, the world's largest 2,000 ton gantry crane used in the Grand Coulee Dam power plant project, and creating equipment that has been used on the Alaska pipeline project.