The choice of computer to integrate the various sensor systems was wrong, as the GEC 4080M was simply too slow and too underpowered to perform the tasks required of it: by the time of project cancellation, the mission system mean time between failure was around 2 hours, yet it took around 2 and a half hours to load all the mission data via a tape system.
34 sectors of 512 data bytes each per track is the configuration used on the GEC 4000 series minicomputers.
ATP International Series | World Series | World Series of Poker | ATP International Series Gold | Star Trek: The Original Series | ATP World Tour 250 series | Buffy the Vampire Slayer (TV series) | series | ATP World Tour 250 Series | Gossip Girl (TV series) | Casualty (TV series) | House (TV series) | The Twilight Zone (1959 TV series) | One Tree Hill (TV series) | limited series | Lost (TV series) | NCIS (TV series) | 90210 (TV series) | The Outer Limits (1963 TV series) | Sprint Cup Series | Monk (TV series) | Angel (TV series) | The Avengers (TV series) | Top Gear (2002 TV series) | Heartbeat (UK TV series) | ATP World Tour 500 series | Six Feet Under (TV series) | Cold Case (TV series) | Bones (TV series) | The View (U.S. TV series) |