X-Nico

2 unusual facts about Beris Dam


Beris Dam

Located within Sik district in Kedah, the dam is a concrete-faced rockfill dam located in a narrow valley along Beris River, 1.6km upstream from the river's confluence with Muda River.

Muda River

The Beris Dam, which was completed in 2004 at a cost of RM360 million, is used to regulate the flow of water along the Muda River basin to augment water available for irrigation of paddy or upland crops, for domestic and industrial water supply and other uses.



see also