X-Nico

4 unusual facts about FCM 36


FCM 36

Due to the rout of the last French defence line at Bulson during the night and the ensuing confusion, the approach march could only begin early in the morning of the 14th, when the first German tanks started to cross the river on pontoon bridges.

The Forges et Chantiers de la Méditerranée (FCM), located at Toulon, had some previous experience with tank production as it had constructed the ten giant Char 2C tanks in 1921 and had been involved in the development of the Char B1.

When German infantry on 13 May 1940 established a bridgehead over the Meuse at Sedan, the FCM 36 battalions were late in the afternoon ordered to counterattack and reduce it, cooperating with an infantry regiment, as they themselves had no organic infantry component.

The battalion attacked and defended Stonne on 15 May, but was driven from this key position with some losses.


Similar

FCM's | FCM Baia Mare |


see also