The prototype STEM yo-yo is under construction at Berzano di San Pietro (Italy).
•
Economic capital, performance evaluation, and capital adequacy is proceeding from evaluator agency (Sanpaolo-Intesa Bank).
•
In September 2012 KiteGen sent an offer to Italian Government to relieve the aluminium smelter in Portovesme from ALCOA and run it with his wind capturing technologies.