equipment: Electrified, LZB signalling, "Zugfunk" radio, GSM-R, BOS-Funk, C-Netz (from 1992 to 2000), GSM900/1800 (T-mobile, Vodafone and Eplus since the middle of 2006), FM radio, wind direction measuring system, two emergency exits)
The running speed through the station was raised from 30 to 160 km/h; an increase to 197 km/h, which was also considered, would have required the control of active tilting technology by the train safety system, LZB, but this was not put into practice.