Implementation of this multipurpose project was based on the preliminary study conducted in 1973 by the National Irrigation Administration (NIA) with the assistance of the United States Bureau of Reclamation (USBR) and the United States Agency for International Development (USAID).
dam | Hoover Dam | Aswan Dam | Grand Coulee Dam | Kinzua Dam | Bonneville Dam | Grand Rapids Dam | embankment dam | Beaver Dam, Arizona | Merowe Dam | Beaver Dam, Wisconsin | Three Gorges Dam | Mangla Dam | Beaver Dam | Aswan Low Dam | Akosombo Dam | Shasta Dam | Itaipu Dam | Fort Peck Dam | Fontana Dam | Dam Square | Chickamauga Dam | Yacyretá Dam | Wilson Dam | Tiga Dam | Temenggor Dam | Tarbela Dam | Tai Dam | Tabqa Dam | Safe Harbor Dam |