The design was prepared by the National Engineering Services Pakistan (NESPAK) and the construction contract was awarded in June 2002 on EPC/Turnkey basis to Mirani Dam Joint Venture, a consortium led by Descon Engineering Limited.
dam | Hoover Dam | Aswan Dam | Grand Coulee Dam | Kinzua Dam | Bonneville Dam | Grand Rapids Dam | embankment dam | Beaver Dam, Arizona | Merowe Dam | Beaver Dam, Wisconsin | Three Gorges Dam | Mangla Dam | Beaver Dam | Aswan Low Dam | Akosombo Dam | Shasta Dam | Itaipu Dam | Fort Peck Dam | Fontana Dam | Dam Square | Chickamauga Dam | Yacyretá Dam | Wilson Dam | Tiga Dam | Temenggor Dam | Tarbela Dam | Tai Dam | Tabqa Dam | Safe Harbor Dam |