X-Nico

3 unusual facts about Office du Niger


Office du Niger

The irrigation scheme utilizes two ancient branches of the Niger River, the Fala de Molodo that runs northwards from the Niger for 135 km to the Alatona region and the Fala de Boky-Wéré that runs in an east-northeast direction towards the town of Macina.

The canal begins at Kolongo Tomo and runs in a northeasterly direction parallel to the Fala de Boky-Wéré.

The land lies to the northeast of the town of Macina, and at the time was occupied by a number of villages.



see also