The final surveys were done for the Guruvayur-Tanur railway line in January 2003, which will cover 51 km.
•
In January 19, 1985, Indian Railway officially notifies Guruvayur-Tanur line for construction as temple town is a notified pilgrimage area.
•
After carrying out detailed studies and examining various alternatives, it was decided to connect Tanur, on the Shoranur - Mangalore Section, to Guruvayur.
Tanur |