On 21 October 2011, Wabtec signed a $63 million contract with Denver Transit Partners to construct the positive train control system for the Eagle P3 commuter rail lines.
Wabtec Corporation (derived from Westinghouse Air Brake Technologies Corporation) is an American company formed by the merger of the Westinghouse Air Brake Company (WABCO) and MotivePower Industries Corporation in 1999.
•
The other company forming Wabtec, MotivePower Industries, can be traced back to 1972 with the formation of a Rail Systems Group by the Morrison Knudsen group; and the purchase of a manufacturing facility in Boise.
Wabtec |
The PL42 has 800 kilowatts head-end power and WABCO's EPIC II braking system, along with an E-7 wheel slide device, made by Wabtec, preventing flats spots on the wheels through software and hardware.