Carosue Dam Gold Mine

On 15 June 2009 Saracen announced that the mine would be connected to the Western Power grid through a 90 km power line rather than being supplied by diesel generators on site.


see also

Honister Slate Mine

By 1926, following a change of management and a new Resident Director, Robin Hoare, the slate works at the Hause had been electrified (powered by two large Ruston 4-cylinder diesel generators), together with considerable modifications undertaken throughout the quarries, and the mine's fortunes began to improve with significantly increased production.

Huxley Hill Wind Farm

Huxley Hill Wind Farm (also known as the King Island Wind Farm) is a wind power station at King Island, Tasmania, Australia, of around 1600 residents, owned by Hydro Tasmania, which supplements the four diesel generators with a combined capacity of 6 MW at Currie Power Station.