In 1837 at the prompting of Matthias Schönerer, who was also heavily involved in the Budweis–Linz–Gmunden wagonway, he drew up plans for the repair shop of the Wien-Raaber railway (later Lokomotivfabrik der StEG), and in 1839 became entrusted with carrying them out, along with the mechanical engineer Kraft.