X-Nico

3 unusual facts about Spa Valley Railway


Spa Valley Railway

First, the East Grinstead to Lewes line closed in 1958, then the Cuckoo Line in 1965, the Three Bridges to Groombridge in 1967, and finally the Wealden Line south of Uckfield in 1969.

En route it crosses the Kent and East Sussex border, a distance of 5 miles (8 km), along the former Three Bridges to Tunbridge Wells Central Line / Cuckoo Line.

The railway was engineered by the London, Brighton and South Coast Railway's (LB&SCR) Chief Engineer Frederick Banister, as part of the East Grinstead, Groombridge and Tunbridge Wells Railway (EGGTWR), itself an extension to the Three Bridges to East Grinstead Railway which had been completed in 1855.


High Rocks

The Spa Valley Railway, a heritage railway, now connects the High Rocks pub beyond the High Rocks turnstiles to Tunbridge Wells, Groombridge and Eridge (on the London-Uckfield line of Southern Railway).


see also