A treaty between Prussia and Saxony signed on 24 July 1843 authorised the construction of a cross-border railway and its proposed connection to the Lower Silesian-Markish Railway from Görlitz to Węgliniec (Kohlfurt) was the first step in the building of the railway between Dresden and Görlitz.