Anxiolytic medications that act as 5-HT receptor agonists (in particular, 5-HT1A) together with CRH and/or cortisol antagonists (which are implicated in the stress response) are hypothesized to be an appropriate method of achieving this therapeutic response.
It is expected to reduce travel time between Chengdu and Chongqing to 75 minutes, 45 minutes quicker than the current CRH route via Suining.
The first train (CRH5-001A) departed from Savigliano port, Italy on December 11, 2006 and arrive at Dalian port on January 28, 2007.
Plasma CRH levels are inadequate at diagnosis (with the possible exception of tumors secreting CRH) because of peripheral dilution and binding to CRHBP.