The line, through efforts from PA Congressman Jim Gerlach (R-PA 6) and the Delaware Valley Regional Planning Commission, may be extended back to Parkesburg and even further to Atglen in the future.
•
The total cost of electrification was over USD $200 million, which was financed by government-supported loans from the Reconstruction Finance Corporation and the Public Works Administration.
•
Norfolk Southern operates overnight freight service between the western junction of the Trenton Cutoff (a former Penn Central electrified "through-freight" line) and just west of Parkesburg via trackage rights, mainly supplying the Mittal steel plate manufacturing plant in Coatesville.
Northeast Corridor | Keystone | Island Eastern Corridor | Capitol Corridor | Wakhan Corridor | Pan-European Corridor X | Keystone Cops | Keystone Studios | Keystone Cup | Shock Corridor | Polish Corridor | Keystone Pipeline | Keystone Lake | Keystone, Colorado | East-West Corridor | Central Corridor Rail Line | Blackstone River Valley National Heritage Corridor | Alameda Corridor | West Berlin Air Corridor | U.S. Route 48 (Corridor H) | Trans-Texas Corridor | Standard Corridor | Springwater Corridor | Red Rock Corridor | Quality Bus Corridor | Polish corridor | Persian Corridor | Pan-European corridor X | Pan-European Corridor IV | Northwest Corridor HOV/BRT |