The other line, Line 9, started construction in 2001 and opened in 2004, with recent extensions in 2011.
East Coast Main Line | West Coast Main Line | New Line Cinema | Cunard Line | White Star Line | The Onedin Line | Maginot Line | Great Central Main Line | What's My Line? | Walk the Line | Stena Line | Line 13, Shanghai Metro | Line 13 | A Chorus Line | What's My Line | V/Line | branch line | Wirral Line | Siegfried Line | Midland Main Line | Gyeongbu Line | Line Renaud | Line Islands | Line 2 | Line 1, Beijing Subway | Line 1 | Green Line | Brighton Main Line | The Thin Red Line (1998 film) | The Thin Red Line |
On October 17, 2007, Companhia Paulista de Trens Metropolitanos (CPTM) began to operate the new station of the Line C (currently called Line 9), Autódromo, near the circuit.
Currently, all trains on Lines 2, 5, 8, 10, 13, Airport Express and older models on Line 1 are made by Changchun RVC, which is under contract to supply trains for Lines Yizhuang, 9 and 10 (Phase II).
During the Enbridge Line 9 protests and occupation in Hamilton, McHale and CANACE claimed to have played an important role in disrupting the protest through lobbying the Hamilton Police Service.
Today it has been transformed into a voie verte (green route) and replaced with bus service provided by TER Lorraine (line 9), extended to La Bresse.
Also in 1990, line 9 to the Watergraafsmeer was extended to Diemen (Sniep).