On 16 May 2013, national grid owner Transpower applied for consent to the Kapiti Coast District Council to rebuild its Valley Road, Paraparaumu substation to 220 kV and build two short transmission lines to connect it to the two Bunnythorpe to Haywards 220 kV lines to the east.
Transmission Control Protocol | M4 motorway | M1 motorway | M6 motorway | Hemus motorway | Electric power transmission | M25 motorway | automatic transmission | Transmission electron microscopy | M5 motorway | M2 Hills Motorway | M40 motorway | Digital Transmission Content Protection | Diesel-electric transmission | Allison Transmission | Transmission medium | Semi-automatic transmission | M54 motorway | M11 motorway | transmission control protocol | Tea Tree Gully, South Australia | Tea Tree Gully | Shifting Gears: A Bisexual Transmission | Sequential manual transmission | Scanning transmission electron microscopy | Northwestern Motorway | National Transmission Corporation | Message Transmission Optimization Mechanism | M90 motorway | M63 motorway |