X-Nico

2 unusual facts about Ledbury Signal Box


Ledbury Signal Box

This method of operation and equipment, unique to this line, was originally used only through the two single line tunnels on this line, at Ledbury; and under the Malvern Hills between a former signal box at Colwall to the signal box at Malvern Wells.

A new additional telephone system was introduced in 2012 with the advent of GSM-R this is a GSM, 3G telephone system that allows signallers to contact the train crew by voice or text and can link into the communication systems used by the British police, fire and ambulance services.



see also