X-Nico

unusual facts about Weil der Stadt


Weil der Stadt

Later the suffix "die Stadt" (the town) was added to distinguish the town from villages of the same name, such as Weil im Dorf and Weil im Schönbuch.


Stuttgart S-Bahn

Work was completed in September 1978 and operation of the Stuttgart S-Bahn began with three lines (all beginning at Schwabstraße station): the S1 to Plochingen via Esslingen, the S4 to Ludwigsburg and the S6 to Weil der Stadt via Feuerbach and Leonberg.


see also

Weil der Stadt station

The facade of the building is built of red sandstone (Buntsandstein), which is also found in other buildings in Weil der Stadt (e.g. the church and the Rundbogenstil pillars of the town hall).